Minimal depth aimed at proving feasibility fast. Almost everything except the bare path to running code is skipped: capture the intent, reverse- engineer any existing code, pull the requirements, then generate and test. No design ceremony, no operations, no delivery planning.

Change Control defaults to relaxed: an input that changes after approval is recorded and announced in one line, and the spike keeps moving.

Why these stages, why skip those

A proof of concept answers one question — "can this work?" — so it keeps only the stages that get to an answer: intent-capture, reverse-engineering, requirements-analysis, code-generation, build-and-test. The whole point is to discard the rest (domain-design, units-generation, nfr work, the operation phase) because a spike is throwaway. If the answer is yes, re-scope to feature/mvp and run the full arc on the real build.

Membership

Keyword triggers: proof of concept, prototype, poc, spike. Initialization plus the thin feasibility path execute; everything else is SKIP.