Composing a Workflow Plan
The composer's job is to fit the CEREMONY to the TASK: propose the minimum
viable workflow - the least sufficient EXECUTE set that still produces every
artifact the task's outcome depends on. Both directions of error are real:
skipping a load-bearing stage has a cost someone pays later, and including
overlapping ceremony "just in case" collapses a composed grid back toward the
stock feature scope and defeats the point of composing. Every EXECUTE and
every SKIP must be justified against the entropy profile; neither default
caution nor default economy is acceptable.
How to read a task
- Score before you select. Estimate the five entropy components (intent ambiguity, structural uncertainty, verification entropy, risk, unresolved assumptions) from the task and the structural evidence BEFORE looking at any stock scope. The component bands - not keyword vibes - drive which stages carry positive expected value.
- Incremental vs net-new. A bug fix, a refactor, a security patch, and a hardening pass work WITHIN an existing system: they need to understand what exists (reverse-engineering on brownfield, or CodeKB evidence where indexed), state what "done" means, and change-plus-verify (code-generation, build-and-test). They do not need market-research, user-stories, or domain-design - those discover and shape a product that already exists.
- Net-new surface. A new feature, product, or service needs the discovery arc: intent-capture, scope-definition, then the inception design stages in proportion to how much NEW structure it introduces.
- Operational outcome. Deployment, observability, incident-response, and performance stages belong on the plan when the task's DONE lives in an environment, not in the repo. A plan that builds but never ships closes no operational task.
- Brownfield vs greenfield changes the WHOLE grid, not one stage: a brownfield feature leans on existing structure and can compress discovery; a greenfield feature has nothing to reverse-engineer and everything to scope.
Grid discipline
- Every required consume must have its producer on the EXECUTE set (the validator enforces it; in-flight strict mode rejects). Never balance a starved input by silently adding the producer - name the addition in the rationale so the human sees the plan grow and why.
- Stages are data-coupled, not just ordered: check
consumes/producesin the stage graph before cutting anything mid-arc. - Fold overlapping stages: when two stages both reduce the same component, one is a justified stage and the other is a fold candidate. Keep the spine (core, verification, and the single load-bearing discovery/design stage for a high component); fold framing/discovery stages whose output another EXECUTE stage already delivers, and name the un-SKIP trigger.
- For front/report composition, prefer a stock scope when the final proposal's
validator-computed
nearest_stockdistance is within 2 flips (adopt and revalidate the stock grid, then rebuild the summary and decision table from that final grid; note the dropped flips at the gate). The earlier mechanical screen's distance is advisory and never overrides evidence-driven folds. A custom scope is maintenance surface the user owns forever. A human edit to an adopted stock grid converts it to custom so the edit has a persistence path. When no stock scope fits the final proposal, synthesize - do not force a bad match. - In-flight recomposition never adopts a stock scope. Preserve the running
workflow's scope, depth, and frozen actions, then return only the strict-
validated pending delta as exact
changes.skip/changes.addarrays for the conductor'srecomposecommand.
Change Control
Every proposal names ONE Change Control value with a one-line rationale. The
value decides what happens when an input changes after the human approved or
confirmed something: strict reopens that approval; relaxed records the
change once, tells the human in one line, and continues. It never removes a
gate, so it is a question of how much the team wants to be asked again, not of
how much is checked.
- A matched stock scope carries its own default (
change_control:in the scope file; the shipped defaults are strict on enterprise, security-patch, and infra, relaxed everywhere else). Adopt it and say so. - For a custom grid, read the entropy profile the same way the grid was read: high risk or verification entropy, regulated work, or several people sharing the approvals point to strict; a spike, a fix, or a solo run where every changed file would otherwise mean another approval points to relaxed.
- In-flight, the running intent's value stays as it is; the human flips it from chat, never the composer.
- The human sees the value as its own gate row and can flip it before approving. A memory layer that declares strict wins over any proposal; the validator and the intent-create command both refuse a relaxed value under it.
Rationale quality
The gate is only as good as the rationale. For each SKIP write one line a human can veto: the stage, what it would have produced, and why this task does not need that artifact (below-threshold component, or the task/artifact/EXECUTE stage that already covers it). For each EXECUTE name the component it reduces and that no other EXECUTE stage already delivers that reduction. "Not needed" is not a rationale; "no new UI surface, so refined-mockups produces nothing this task consumes" is.