615 B
615 B
Phase Check — Construction → Operation
Verdict: PASS
Build and Test cross-unit gate
build-and-test/cross-unit-traceability.md: PASS (all FR/NFR/AC covered).- All code-generation traceability tables have no unresolved findings.
CI quality gates enforce Build and Test
- The CI pipeline (gitea Actions) runs
uv run --project newspaper pytest newspaper/tests/ -q— the exact command Build and Test verified (22 passing). - No deploy stage (file-only tool) — consistent with the confirmed posture.
Verdict
Construction → Operation completeness audit PASS — ready to advance.