Phase Check — Construction → Operation

Verdict: PASS

Build and Test cross-unit gate

  • build-and-test/cross-unit-traceability.md: PASS (all FR/NFR/AC covered).
  • All code-generation traceability tables have no unresolved findings.

CI quality gates enforce Build and Test

  • The CI pipeline (gitea Actions) runs uv run --project newspaper pytest newspaper/tests/ -q — the exact command Build and Test verified (22 passing).
  • No deploy stage (file-only tool) — consistent with the confirmed posture.

Verdict

Construction → Operation completeness audit PASS — ready to advance.