newspaper_wedding/.aidlc/scopes/aidlc-workshop.md
Andrew Ridgway bec1eaac87
Some checks failed
Test / test (push) Has been cancelled
first pass at the newspaper builder
2026-09-14 11:57:22 +10:00

43 lines
1.5 KiB
Markdown

---
name: workshop
depth: Standard
testStrategy: Minimal
keywords:
- workshop
- lab
- training
description: Facilitated group session with mandatory gates
skeleton: on
review_cap: advisory
change_control: relaxed
---
# workshop scope
Standard depth for a facilitated group session with mandatory gates, but
with a Minimal test strategy - the `testStrategy` override that keeps the
test floor light for a teaching context. It runs the inception,
construction, and operation arc end to end (so participants see the whole
lifecycle) while skipping the ideation discovery stages that a facilitator
front-loads by hand.
Change Control defaults to relaxed so a moved input is reported once and the session keeps going; a facilitator who wants every reopened approval surfaced sets strict.
## Why these stages, why skip those
A workshop walks a group through the methodology, so it keeps the
substantive build and operate stages visible: reverse-engineering,
practices-discovery, the full inception design pass, construction, and the
operation phase all run. It skips the early ideation ceremony
(market-research, feasibility, scope-definition, team-formation,
rough-mockups, approval-handoff) because the facilitator scopes the
exercise up front rather than running those stages live. The
`testStrategy: Minimal` override means tests are demonstrated, not held to
the production floor.
## Membership
Keyword triggers: `workshop`, `lab`, `training`. Initialization, the
inception set, all of construction, and all of operation execute; the
ideation discovery stages are SKIP.