Files
newspaper_wedding/.aidlc/tools/data/memory-seed/phases/operation.md
T
2026-09-14 11:57:22 +10:00

1.3 KiB

Operation Phase Guardrails

These rules apply to every stage whose phase: operation declaration imports them as the matching phase rule.

Infrastructure Safety

  • Infrastructure changes require security review — document the security implications of every change
  • Never remove or bypass existing security controls without explicit approval and documented rationale
  • Changes to IAM roles, network policies, or encryption settings must include a risk assessment

Deployment Procedures

  • All deployment procedures must include rollback steps — document how to reverse every change
  • Deployments to production must have a defined smoke test or health check to verify success
  • Blue/green or canary strategies must document traffic-shifting criteria and abort conditions

Observability

  • SLOs must be quantified with specific percentages and time windows (e.g., "99.9% availability over a 30-day rolling window")
  • Alerting thresholds must be set below SLO breach to allow time for remediation
  • Every new service or component must have at least one health metric and one error rate metric

Incident Response

  • Runbooks must include escalation paths and contact information
  • Post-incident reviews are required for any P1/P2 incident — document timeline, root cause, and prevention

Corrections