# Phase Check — Construction → Operation
**Verdict:** PASS
## Build and Test cross-unit gate
- `build-and-test/cross-unit-traceability.md`: PASS (all FR/NFR/AC covered).
- All code-generation traceability tables have no unresolved findings.
## CI quality gates enforce Build and Test
- The CI pipeline (gitea Actions) runs `uv run --project newspaper pytest
newspaper/tests/ -q` — the exact command Build and Test verified (22 passing).
- No deploy stage (file-only tool) — consistent with the confirmed posture.
## Verdict
Construction → Operation completeness audit **PASS** — ready to advance.
@@ -0,0 +1,24 @@
# Phase Check — Inception → Construction
**Verdict:** PASS
## Traceability audit (aggregate)
| Stage traceability | Rows | Non-OK |
|---|---|---|
| user-stories | 17 | 0 |
| domain-design | 10 | 0 |
| units-generation | 10 | 0 |
All `coverage` rows are `OK`; no `GAP`, `ORPHAN`, invalid targets, or missing
upstream IDs. Contract Design owns formal contracts (not requirement coverage) and
does not contribute a traceability.json — by design.
## Upstream completeness
- Requirements (FR/NFR) → User Stories (US) → Domain Design components → Units → Contracts: all chained with OK coverage.
- No unresolved findings block the Construction boundary.
## Verdict
Inception completeness audit **PASS** — ready to advance to Construction.